Tell us the megawatts. We look for the acres.

For developers, hyperscalers and neoclouds

Our supply comes from owners who contact us directly — farmers, ranchers, family trusts and industrial owners who have not listed with a broker. Send the load and the regions; we come back with parcels that fit, or tell you we have none.

What a useful brief contains

  • Load and ramp. Initial MW and full build-out. A 20 MW edge site and a 1 GW campus need completely different substations.
  • Energization date. This decides whether only existing headroom counts or a new transmission-level substation is realistic.
  • Regions you rule out. Counties with a moratorium, ISOs you avoid, water-stressed basins. We keep the restrictions list current.
  • Power strategy. Grid only, or open to on-site generation as a bridge.

How we work with you

  • Your requirements stay confidential. Owners see an anonymised brief unless you agree otherwise.
  • We screen each parcel before it reaches you: substation and line proximity, utility, local restrictions, flood zone, access.
  • Introductions happen only with the owner's written consent, so every parcel you see is one the owner has agreed to discuss.
  • Our fee is agreed in writing before the first introduction. Disclosure.

Need a few racks or a cage rather than a campus? Published colocation prices are compared on wattandrack.com.

Site request form

1. Load
2. Where and how much land
Power source preferences
3. You

Requirements stay confidential. We share them with landowners only in anonymised form unless you agree otherwise. Privacy.